cold room temperature mapping validation and qualification protocol and procedure

cold room temperature mapping validation and qualification protocol and procedure

3. SCOPE
The Installation / Operational Qualification protocol is a comprehensive document, which will be used to guide the executants, in the verification of the proper installation and operation of the walk-in cold room (ID number: Cold Room 1 (DIP)) located into the warehouse of Dubai DIP.
4. OBJECTIVE
The purpose of this Installation / Operational Qualification is to:
 Briefly describe the equipment, its major components and their roles.
 Verify that the walk-in cold room (ID number: Cold Room 1 (DIP)) is properly installed according to the manufacturer and XXXXXXXXXXXX LLC. specifications thus permitting operation as per design specifications.
 Ensure that appropriate identification and documentation are in place.
 Ensure that the physical characteristics are compatible with planned equipment utilization.
 Ensure that appropriate operation procedures and training program are in place.
 Ensure that appropriate calibration (if necessary) and maintenance program are in place.
 Ensure that all features of the equipment described are functioning in the proper manner as required to perform all operations associated with its use. Specific tests are designed to verify that the equipment operates within all applicable design.
Detailed technical information can be found in the technical documents supplied by the manufacturer (refer to Section 12.1: Documentation for Installation).